Home
Fisheries, Aquatic Habitat and Water Quality Resource Group
Wildlife & Terrestrial Habitat Resource Group
Recreation, Land Use and Aesthetics Resource Group
Cultural Resource Group
Whitewater Resource Group
Contact Us
 
Click on any of the above Resource Groups for more detailed information.

MYSTIC PROJECT ILP DOCUMENTS
FILED WITH THE COMMISSION
SINCE 7/1/04

October 3, 2005
Mystic Lake 2005 Study Results: Studies No. 1-20

Filing Letter and Table of Contents   download PDF » (2.01 Mb)

Download PDF: Study 1 and 2» (446 kb)
1. Archaeological Inventory on Potential Project Effects:
    Mystic Lake, West Rosebud Lake, and Plant Operating Area

2. Inventory and Evaluation of Plant Operating Facilities
      
Download PDF: Study 3» (319 kb)
3. Jurisdiction of West Rosebud Road

Download PDF: Study 4» (319 kb)
4. Reliability of Transmission Lines and Feasibility of
    Eliminating Redundant Line

Download PDF: Study 5» (73.5 Kb)
5. West Rosebud Creek Bypass Reach Habitat and
    Fish Population Evaluation

Download PDF: Study 6» (1.27 Mb)
6. Hydrologic Characterization of the West Rosebud
    Creek Bypass Reach between Mystic Lake Dam
    and the Powerhouse

Download PDF: Study 7» (1.6 Mb)
7. Water temperature monitoring in the Mystic
    Lake Project Area

Download PDF: Study 8» (840 kb)
8. Mystic Project Effects on Mystic Lake Spill Hydrology
    
Download PDF: Study 9, 10, and 11» (13.5 Mb)
9. Aerial Survey of Riparian Corridor
  
10. Shoreline Erosion Inventory at Mystic Lake
 
11. Sensitive Plants in the Mystic Lake Hydroelectric
      Project Area

Download PDF: Study 12» (1.28 Mb)
12. Flow Restoration Action Plan for Flow-line or
      Penstock Shutoff

Download PDF: Study 13» (2.96 Mb)
13. Mystic Hydroelectric Project Whitewater Flow Study

Download PDF: Study 14» (2.86 Mb)
14. Mystic Hydroelectric Project Recreation Use Counts

Download PDF: Study 15» (1.92 Mb)
15. Mystic Hydroelectric Project Water Quality Studies
      
Download PDF: Study 16 and 17» (525 Kb)
16. Biological Assessment of Federally Listed Species

17. Biological Evaluation of Forest Service Sensitive Species

Download PDF: Study 18» (6.25 Mb)
18. Evaluation of the Current Fish Population and
      Habitat in West Rosebud Creek Downstream from
      Emerald Lake

Download PDF: Study 19» (4.74 Mb)
19. Fish Habitat In and Upstream of Maxie Creek
      
Download PDF: Study 20» (392 kb)
20. Ramping Rates in West Rosebud Creek

 

Get Adobe Reader Use Adobe Reader to
view PDF documents

 


 

Commission Order Issuing New License for Mystic Project (12/17/07) download pdf»

Hydro Review Article of the Mystic Lake ILP Experience (6/2007) download pdf»

Mystic Process Plan & Communications Protocol (updated 2/20/07) download pdf»

Final Meeting Summaries (updated 6/11/08) go»

Mystic Project ILP
documents filed with the Commission since 7/1/04 to present go»

Pre 7/1/04 Mystic ILP Studies and Documents go»

Mystic Boundary Wilderness Issue go»

 

 
Copyright © 2004, 2005, 2006, 2007, 2008. PPL Montana All Rights Reserved.
For questions regarding the content of this site: Contact PPLM.
For general questions about this site: Contact Webmaster.